Description
Senate File 183 consists of two divisions that do the following:
Division I
• Prohibits the Iowa Board of Regents from entering into a design-build contract to construct,
repair, or improve buildings or grounds. This prohibition does not apply to projects that are
currently under contract. Provisions of Division I that amend Iowa Code section 262.34 are
effective immediately.
• Prohibits governmental entities from utilizing the fee-based selection of an architect,
landscape architect, or engineer for a public improvement.
Division II
• Adopts new definitions for “construction manager-at-risk,” “governmental entity,”
“guaranteed maximum price contract,” and other terms.
• Authorizes a governmental entity to enter into a guaranteed maximum price contract for the
construction of a public improvement.
• Adopts procedures and requirements for public entities that are pursuing a guaranteed
maximum price contract. These procedures include public disclosures, a request for
qualifications, a request for proposal, and the selection of bid winners.
• Prohibits all governmental entities from entering into a design-build contract for the
construction of a public improvement.
• Prohibits governmental entities from entering into a guaranteed maximum price contract for
public improvements relating to highway, bridge, or culvert construction.
Background
With the exception of the Board of Regents, all current public improvement projects are
completed using a process that requires governmental entities to bid projects using a design-
bid-build contract.
The Board of Regents currently uses both design-bid-build and design-build contracts. The
Board has completed or initiated a total of 14 contracts using design-build to develop projects.
As of February 2021, the Board had completed seven projects using design-build. These
projects are listed in Table 1.
1
Table 1 — Board of Regents Projects Completed Under Design-Build
Institution Project Completion Budget
Iowa Hawkeye Tennis and Recreation Complex Dec. 2014 $15,000,000
Iowa Biomedical Research Support Facility Dec. 2015 33,868,000
Iowa Elizabeth Catlett Residence Hall Jun. 2017 95,000,000
Iowa Chilled Water Plant 2 (West) Jul. 2018 5,200,000
Iowa Hancher Footbridge Aug. 2018 3,200,000
Iowa State Gregory L. Geoffroy Hall Dec. 2016 49,500,000
Iowa State Poultry Farm Spring 2020 5,750,000
Iowa State Gerdin Business Building Fall 2020 28,000,000
Northern Iowa McElroy Hall Aug. 2001 2,000,000
The Board is also planning or currently working on seven projects that will use design-build.
These projects are reflected in Table 2.
Table 2 — Ongoing Board of Regents Projects Under Design-Build
Scheduled
Institution Project Completion Phase Budget
Iowa Oakdale Studio Dec. 2021 Construction $ 2,500,000
Iowa Women's Soccer Fall 2021 Construction $ 3,900,000
Iowa State Curtiss Farm-Feed Mill and Grain Science Summer 2021 Select DB 21,200,000
Iowa State Veterinary Diagnostic Lab Summer 2023 RPF for DB 75,000,000
Iowa State Industrial and Manufacturings Sys. Engin. tbd. Programming 40,000,000
Iowa State LeBaron Hall Summer 2024 Programming 55,000,000
Iowa State Utilities Power Plant Jun. 2023 Programming 14,000,000
Iowa State Veterinary Diagnostic Lab - Addition tbd. Programming 62,400,000
Assumptions
• Allowing public entities to enter into guaranteed maximum price contracts may allow
additional flexibility when designing public improvement projects. The extent to which
governmental entities may use these agreements and the impact of them is unknown.
• Prohibiting the use of design-build may impact expenses for future Board projects by an
unknown amount. The extent to which the Board of Regents may use guaranteed maximum
price contracts and the impact of them is unknown.
Fiscal Impact
Prohibiting the use of design-build will have an unknown impact on Board of Regents building
projects. The fiscal impact of allowing all public entities to enter into guaranteed maximum price
contracts cannot be determined at this time.
2
Sources
Iowa Board of Regents
Legislative Services Agency
/s/ Holly M. Lyons
February 8, 2021
Doc ID 121130611306
The fiscal note for this Bill was prepared pursuant to Joint Rule 17 and the Iowa Code. Data used in
developing this fiscal note is available from the Fiscal Services Division of the Legislative Services
Agency upon request.
www.legis.iowa.gov
3

Statutes affected:
Introduced: 26.4, 26.3, 262.34
Enrolled: 26.4, 26.3