ENROLLED ORIGINAL
AN ACT
_______________
IN THE COUNCIL OF THE DISTRICT OF COLUMBIA
__________________
To require, on a temporary basis, that the District Department of Transportation to publish a
report identifying modifications to roadways in each ward that will create space for uses
other than for motorized vehicles and to set a timeline for implementation.
BE IT ENACTED BY THE COUNCIL OF THE DISTRICT OF COLUMBIA, That this
act may be cited as the Connected Transportation Network Temporary Act of 2020.
Sec. 2. Connected transportation network.
(a) Within 28 days after the effective date of this act, the District Department of
Transportation (DDOT) shall publish a report identifying modifications to at least 20 miles of
streets in the District, including streets in all 8 wards, that will allow, in the roadway, uses other
than for motorized vehicles, such as for bicycles. The streets identified pursuant to this
subsection shall, to the greatest extent possible, be connected to each other, creating a network of
lanes or safe traveling spaces.
(b) The modifications identified pursuant to subsection (a) of this section shall be one of,
or a combination of, the following:
(1) Closure of a street to through traffic;
(2) Creation of a protected bicycle lane; or
(3) Reduction of travel lanes to expand public space.
(c)(1) By September 1, 2020, DDOT shall implement at least 20 miles of the
modifications identified in the report required by subsection (a) of this section; except, that no
modifications shall be implemented in Ward 8.
(2) By October 15, 2020, DDOT shall amend the report required by subsection (a)
of this section, to include at least 5 additional miles of modifications.
(3) By November 1, 2020, DDOT shall have implemented at least another 5 miles
of modifications identified in the report required by subsection (a) of this section; except, that no
modifications shall be implemented in Ward 8.
(d) Modifications made pursuant to this section shall remain in place until at least 270
days following the expiration of a public health emergency declared pursuant to section 5a of the
1
ENROLLED ORIGINAL
District of Columbia Public Emergency Act of 1980, effective October 17, 2002 (D.C. Law 14-
194; D.C. Official Code 7-2304.01), or at such time as the Mayor declares the District to be in
phase 4 of reopening as described in the ReOpen DC Advisory Group Recommendations to the
Mayor, whichever is later.
Sec. 3. Fiscal impact statement.
The Council adopts the fiscal impact statement of the Budget Director as the fiscal impact
statement required by section 4a of the General Legislative Procedures Act of 1975, approved
October 16, 2006 (120 Stat. 2038; D.C. Official Code 1-301.47a).
Sec. 4. Effective date.
(a) This act shall take effect following approval by the Mayor (or in the event of veto by
the Mayor, action by the Council to override the veto), a 30-day period of congressional review as
provided in section 602(c)(1) of the District of Columbia Home Rule Act, approved December 24,
1973 (87 Stat. 813; D.C. Official Code 1-206.02(c)(1)), and publication in the District of
Columbia Register.
(b) This act shall expire after 225 days of its having taken effect.
______________________________
Chairman
Council of the District of Columbia
_________________________________
Mayor
District of Columbia
2