Electric utilities; construction of certain transmission lines; notice required. Requires any electric utility that is responsible for the construction, operation, or maintenance of an electric transmission line of 138 kilovolts or more within a locality to provide at least 180 days' written notice to the governing body of such locality prior to the construction of such transmission line.