Public utilities; certificate of convenience and necessity for certain new transmission lines. Provides that for construction of any overhead transmission line of 230 kilovolts and associated facilities, a public utility shall demonstrate that either the construction of such line remains within an existing right-of-way or that no alternatives are feasible within the existing right-of-way.
Statutes affected: Introduced: 56-265.2
HLC Sub: Subcommittee #3 Substitute: 56-46.1