02-08-24 1:35 PM 2nd Sub. (Gray) H.B. 124
119 retrofit, or replace one or more locomotive engines in order to meet the United States
120 Environmental Protection Agency's Tier 4 emission standards for switch locomotives as
121 described in 40 C.F.R. Part 1033, for a Öº [class I railroad or a] »Ö class III railroad, as defined in
121a 49
122 U.S.C. Sec. 20102, operating Öº [in a county of the first, second, or third class] within the state
122a for no less than 10 months in any calendar year »Ö .
123 (10) "Mineral processing project" means a project that is designed to:
124 (a) process, smelt, refine, convert, separate, or otherwise beneficiate metalliferous
125 minerals as defined in Section 59-5-201 or a metalliferous compound as defined in Section
126 59-5-202;
127 (b) calcine limestone or manufacture cement;
128 (c) process, refine, or otherwise beneficiate chloride compounds, salts, potash, gypsum,
129 sulfur or sulfuric acid, ammonium nitrate, phosphate, or uintaite; or
130 (d) convert or gasify coal to recover chemical compounds, gases, or minerals.
131 [(8)] (11) "Office" means the Office of Energy Development created in Section
132 79-6-401.
133 [(9)] (12) "Tax credit" means a tax credit under Section 59-7-619 or 59-10-1034.
134 [(10)] (13) "Tax credit certificate" means a certificate issued by the office to an
135 infrastructure cost-burdened entity that:
136 (a) lists the name of the infrastructure cost-burdened entity;
137 (b) lists the infrastructure cost-burdened entity's taxpayer identification number;
138 (c) lists, for a taxable year, the amount of the tax credit authorized for the infrastructure
139 cost-burdened entity under this part; and
140 (d) includes other information as determined by the office.
141 [(11)] (14) (a) "Underground mine infrastructure project" means a project that:
142 (i) is designed to create permanent underground infrastructure to facilitate underground
143 mining operations; and
144 (ii) services multiple levels or areas of an underground mine or multiple underground
145 mines.
146 (b) "Underground mine infrastructure project" includes:
147 (i) an underground access or a haulage road, entry, ramp, or decline;
148 (ii) a vertical or incline mine shaft;
149 (iii) a ventilation shaft or an air course; or
-5- Senate Committee Amendments 2-15-2024 lp/gh
Statutes affected: Introduced: 79-6-602, 79-6-603, 79-6-902
Enrolled: 79-6-602, 79-6-603, 79-6-902
H.B. 124 1st Substitute : 79-6-602, 79-6-603, 79-6-902
H.B. 124 2nd Substitute : 79-6-602, 79-6-603, 79-6-902
H.B. 124 3rd Substitute (Not Adopted) Text: 79-6-602, 79-6-603, 79-6-902
Amended: 79-6-602, 79-6-603, 79-6-902
H.B. 124 2nd Substitute (Not Adopted) Text: 79-6-602, 79-6-603, 79-6-902
H.B. 124 1st Substitute (Not Adopted) Text: 79-6-602, 79-6-603, 79-6-902