[Congressional Bills 119th Congress]
[From the U.S. Government Publishing Office]
[H.R. 7515 Introduced in House (IH)]

<DOC>






119th CONGRESS
  2d Session
                                H. R. 7515

  To direct the Secretary of the Interior to convey to the Nisqually 
         Indian Tribe the Clear Creek Hatchery infrastructure.


_______________________________________________________________________


                    IN THE HOUSE OF REPRESENTATIVES

                           February 11, 2026

Ms. Strickland introduced the following bill; which was referred to the 
                     Committee on Natural Resources

_______________________________________________________________________

                                 A BILL


 
  To direct the Secretary of the Interior to convey to the Nisqually 
         Indian Tribe the Clear Creek Hatchery infrastructure.

    Be it enacted by the Senate and House of Representatives of the 
United States of America in Congress assembled,

SECTION 1. CONVEYANCE TO NISQUALLY INDIAN TRIBE OF CLEAR CREEK HATCHERY 
              INFRASTRUCTURE.

    (a) In General.--Not later than 90 days after the date of the 
enactment of this section, the Secretary shall convey to the Nisqually 
Indian Tribe all right, title, and interest of the United States in and 
to the covered infrastructure.
    (b) Requirements.--The conveyance required under subsection (a) 
shall be--
            (1) subject to valid existing rights; and
            (2) for no consideration.
    (c) Map and Legal Description.--
            (1) In general.--As soon as practicable after the date of 
        the enactment of this section, the Secretary shall finalize a 
        map and a legal description of each item to be conveyed under 
        this section.
            (2) Controlling document.--In the case of a discrepancy 
        between the map and the legal description created under 
        paragraph (1), the map shall control.
            (3) Corrections.--The Secretary and the Nisqually Indian 
        Tribe, by mutual agreement, may correct any minor errors in the 
        map or the legal description created under paragraph (1).
            (4) Availability.--The map and the legal description 
        created under paragraph (1) shall be kept on file and available 
        for public inspection in each appropriate office of the United 
        States Fish and Wildlife Service.
    (d) Definitions.--In this section:
            (1) Clear creek hatchery.--The term ``Clear Creek 
        Hatchery'' means the area generally depicted as ``Clear Creek 
        Hatchery'' on each covered map.
            (2) Covered infrastructure.--
                    (A) In general.--The term ``covered 
                infrastructure'' means each of the following items 
                generally depicted on a covered map:
                            (i) Asphalt Pond #11.
                            (ii) Asphalt Pond #13.
                            (iii) Asphalt Pond #14.
                            (iv) Asphalt Pond #15.
                            (v) Asphalt Pond #16.
                            (vi) Clear Creek Spring.
                            (vii) Dam 1.
                            (viii) Dam 2.
                            (ix) Fish Ladder.
                            (x) Hillside Spring.
                            (xi) Incubation Room.
                            (xii) Lower Forebay.
                            (xiii) Lower Site Discharge.
                            (xiv) Pollution Abatement Ponds.
                            (xv) Raceways.
                            (xvi) Spring 1.
                            (xvii) Spring 2.
                            (xviii) Spring 3.
                            (xix) Upper Forebay.
                            (xx) Upper Site Re-Use Flow.
                            (xxi) Water Tower.
                            (xxii) Well 1.
                            (xxiii) Well 2.
                            (xxiv) Well 3.
                            (xxv) Well 4.
                            (xxvi) Well 5.
                    (B) Inclusion.--The term ``covered infrastructure'' 
                includes--
                            (i) each pipe, electrical and communication 
                        conduit, and other infrastructure within the 
                        Clear Creek Hatchery associated with each item 
                        described in subparagraph (A); and
                            (ii) each security fence and road within 
                        the Clear Creek Hatchery.
            (3) Covered map.--The term ``covered map'' means each of 
        the following maps:
                    (A) The map titled ``Nisqually Indian Tribe Clear 
                Creek Hatchery Lower Site'' and dated December 3, 2024.
                    (B) The map titled ``Nisqually Indian Tribe Clear 
                Creek Hatchery Upper Site'' and dated December 3, 2024.
            (4) Secretary.--The term ``Secretary'' means the Secretary 
        of the Interior, acting through the Director of the United 
        States Fish and Wildlife Service.
                                 <all>