[Congressional Bills 118th Congress]
[From the U.S. Government Publishing Office]
[S. 4658 Introduced in Senate (IS)]
<DOC>
118th CONGRESS
2d Session
S. 4658
To provide for the ongoing presence of certain structures at the Table
Rock Lake project.
_______________________________________________________________________
IN THE SENATE OF THE UNITED STATES
July 10, 2024
Mr. Schmitt introduced the following bill; which was read twice and
referred to the Committee on Environment and Public Works
_______________________________________________________________________
A BILL
To provide for the ongoing presence of certain structures at the Table
Rock Lake project.
Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,
SECTION 1. TABLE ROCK LAKE, MISSOURI AND ARKANSAS.
(a) Definitions.--In this section:
(1) Abandonment.--The term ``abandonment'' means, with
respect to an eligible structure, the allowance of the
structure to come into a state of disrepair without the
demonstrated intent to repair by the owner.
(2) Eligible structure.--The term ``eligible structure''
means a privately owned sewer and septic system--
(A) for which a license for a right-of-way has been
provided by the Secretary of the Army and is in effect
on the date of enactment of this Act;
(B) that is located on fee land or land subject to
a flowage easement; and
(C) that does not impact the reservoir level or
pose a failure risk to the dam of the Table Rock Lake
project.
(3) Fee land.--The term ``fee land'' means the land
acquired in fee title by the United States for the Table Rock
Lake project.
(4) Table rock lake project.--The term ``Table Rock Lake
project'' means the Table Rock Lake project of the Corps of
Engineers, located in Missouri and Arkansas, authorized as one
of the multipurpose reservoir projects in the White River Basin
by section 4 of the Act of June 28, 1938 (52 Stat. 1218).
(b) Presence of Eligible Structures.--The Secretary of the Army
shall permit the ongoing presence of an eligible structure at the Table
Rock Lake project until--
(1) the abandonment of the eligible structure by the holder
of a license for right-of-way for the structure;
(2) the failure of the eligible structure; or
(3) the replacement of the eligible structure.
<all>