The bill, S.B. No. 553, amends the Government Code to introduce alternative design-build methods specifically for water and wastewater infrastructure projects. It adds Section 2269.3035, which allows governmental entities to utilize two methods: a "fixed price design-build" method, where a single fixed price for design and construction is established at the contract signing, and a "progressive design-build" method, where the design-build firm is involved early in the process with a stepped payment scheme. Additionally, it clarifies that the requirements of the subchapter apply to these methods as practicable.
Furthermore, the bill modifies existing sections to broaden the applicability of design-build methods to include various governmental entities without the previous population restrictions. It also specifies that contracts for water or wastewater infrastructure projects, including treatment facilities and pipelines, are considered single integrated projects. The bill aims to streamline the construction process for essential infrastructure and is set to take effect on September 1, 2025.
Statutes affected: Introduced: Government Code 2269.352, Government Code 2269.353 (Government Code 2269)