88(R) HB 3433 - Introduced version - Bill Text
  |
  |
 
|
A BILL TO BE ENTITLED
|
 
|
AN ACT
|
 
|
relating to the issuance of air quality permits for certain |
 
|
facilities located in a nonattainment area. |
 
|
             BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
 
|
             SECTION  1.    Section 382.0518, Health and Safety Code, is |
 
|
amended by adding Subsections (b-1) and (b-2) to read as follows: |
 
|
             (b-1)    This subsection applies only to the construction or |
 
|
major modification of a facility that is a major stationary source |
 
|
and is located or proposed to be located in an area designated as a |
 
|
nonattainment area under the federal Clean Air Act (42 U.S.C. |
 
|
Section 7401 et seq.). In making its finding under Subsection |
 
|
(b)(2) as to whether emissions from the facility will contravene |
 
|
the intent of this chapter, the commission shall: |
 
|
                         (1)    conduct an analysis of alternative locations, |
 
|
sizes, production processes, and environmental control techniques |
 
|
for the facility that demonstrates that the benefits of the |
 
|
facility significantly outweigh the environmental and social costs |
 
|
imposed as a result of the facility's location, construction, or |
 
|
modification; and |
 
|
                         (2)    in conducting the analysis required under |
 
|
Subdivision (1), consider the cumulative impacts that would result |
 
|
from the issuance of the permit without changes to the site |
 
|
location, size, production processes, and environmental control |
 
|
techniques. |
 
|
             (b-2)    For purposes of Subsection (b-1), "major stationary |
 
|
source" and "major modification" have the meanings assigned by 40 |
 
|
C.F.R. Section 51.165, as that section existed on January 1, 2023. |
 
|
             SECTION  2.    The change in law made by this Act applies only |
 
|
to the issuance or amendment of a permit for which an application is |
 
|
pending before the Texas Commission on Environmental Quality on or |
 
|
after the effective date of this Act. |
 
|
             SECTION  3.    This Act takes effect September 1, 2023. |