The bill amends Title 66 of the Pennsylvania Consolidated Statutes, specifically focusing on the restructuring of the electric utility industry. It introduces new definitions for "data center" and "hyperscale data center," clarifying the characteristics and requirements for these facilities. A "data center" is defined as a facility primarily used for housing servers and data storage systems, equipped with backup power and cooling infrastructure. A "hyperscale data center" is specified as one with a peak load of at least 25 megawatts for a single facility or 50 megawatts for multiple facilities.

Additionally, the bill establishes new standards for the restructuring of the electric industry, particularly concerning hyperscale data centers. It mandates that such centers built after the effective date of the bill must provide their own baseload generation, which must be constructed within Pennsylvania and can include new generation or repurposed retired assets. Furthermore, these data centers are required to bear the costs of interconnecting with transmission and distribution systems, regardless of their proximity to these systems. The act is set to take effect in two years.

Statutes/Laws affected:
Printer's No. 1953 (Sep 24, 2026): 66-2803