Digest: Allows the use of a third party to study or evaluate a request to connect a project to a power system. (Flesch Readability Score: 60.6).
Allows a person to contract with a third-party consultant to conduct a study or engineering evaluation that a public utility requires for an application to interconnect a community renewable energy project or microgrid.
Takes effect on the 91st day following adjournment sine die.