SECOND REGULAR SESSION

HOUSE BILL NO. 1626 103RD GENERAL ASSEMBLY

INTRODUCED BY REPRESENTATIVE HALEY.

5171H.01I JOSEPH ENGLER, Chief Clerk

AN ACT To repeal section 393.135, RSMo, and to enact in lieu thereof two new sections relating to the Missouri nuclear clean power act.

Be it enacted by the General Assembly of the state of Missouri, as follows:

Section A. Section 393.135, RSMo, is repealed and two new sections enacted in lieu 2 thereof, to be known as sections 393.135 and 393.1250, to read as follows: 393.135. 1. Except as provided in subsection 2 of this section and section 393.1250, 2 any charge made or demanded by an electrical corporation for service, or in connection 3 therewith, which is based on the costs of construction work in progress upon any existing or 4 new [facility of the] electrical corporation facility, or any other cost associated with owning, 5 operating, maintaining, or financing any property before it is fully operational and used for 6 service, [is unjust and unreasonable, and] is prohibited. 7 2. (1) An electrical corporation may be permitted, subject to the limitations in this 8 subsection, to include construction work in progress for any new natural gas-generating unit 9 in rate base. The inclusion of construction work in progress allowed under this subsection 10 shall be in lieu of any otherwise applicable allowance for funds used during construction that 11 would have accrued from and after the effective date of new base rates that reflect inclusion 12 of the construction work in progress in rate base. The commission shall determine, in a 13 proceeding under section 393.170, the amount of construction work in progress that may be 14 included in rate base. The amount shall be limited by: 15 (a) The estimated cost of such project; and 16 (b) Project expenditures made within the estimated construction period for such 17 project.

EXPLANATION — Matter enclosed in bold-faced brackets [thus] in the above bill is not enacted and is intended to be omitted from the law. Matter in bold-face type in the above bill is proposed language. HB 1626 2

18 19 Base rate recoveries arising from inclusion of construction work in progress in rate base are 20 subject to refund, with interest on the refunded amount at the same rate as the rate of interest 21 for delinquent taxes determined by the director of revenue in accordance with section 32.065, 22 if, and to the extent the commission determines, in a subsequent complaint or general rate 23 proceeding, that construction costs giving rise to the construction work in progress included 24 in rate base were imprudently incurred or if the project for which construction costs have been 25 included in the rate base is not placed in service within a reasonable amount of time, as 26 determined by the commission. Rate base used to determine return deferred under 27 subdivision (2) of subsection 3 of section 393.1400 shall include an offset for rate base that 28 has been used to determine return included in base rates as a result of construction work in 29 progress inclusion in rate base under this subsection. The offset shall apply from and after the 30 in-service date of the asset that has been used to determine return included in base rates as a 31 result of construction work in progress inclusion in rate base under this subsection. 32 (2) This subsection shall expire on December 31, 2035, unless the commission 33 determines, after a hearing conducted in 2035, upon a submission from an electrical 34 corporation of an application requesting and demonstrating that good cause exists to extend 35 the effectiveness of this subsection through December 31, 2045. The secretary of the 36 commission shall notify the revisor of statutes when the conditions set forth for the extension 37 of this subsection have been met. 393.1250. 1. This section shall be known and may be cited as the "Missouri 2 Nuclear Clean Power Act", the purpose of which is to enable the construction of clean 3 baseload electric generating plants. This section shall not apply to clean baseload 4 electric generating plants that are in commercial operation before August 28, 2026. 5 2. As used in this section, the following terms mean: 6 (1) "Clean baseload generating plant", a new nuclear-fueled electric generating 7 facility located in this state that is designed to be operated at six hundred megawatts or 8 less and is intended in whole or in part to serve retail customers of an electrical 9 corporation in Missouri; 10 (2) "Construction work in progress", the electrical corporation's share of all 11 capital costs associated with a clean baseload generating plant or renewable source 12 generating facility that have been incurred but have not been included in the electrical 13 corporation's plant in service and are recorded in the Federal Energy Regulatory 14 Commission's Uniform System of Accounts Prescribed for Public Utilities and Licensees 15 Subject to the Provisions of the Federal Power Act, Balance Sheet Chart Accounts, as 16 construction work in progress for electric plants in 18 CFR Part 101, or any other HB 1626 3

17 account established in the Uniform System of Accounts for the recording of construction 18 work in progress. 19 3. An electrical corporation shall be permitted, subject to the limitations in this 20 subsection, to include construction work in progress for any new clean baseload 21 generating plant in rate base amounts recorded. The inclusion of construction work in 22 progress allowed under this subsection shall be in lieu of any otherwise applicable 23 allowance for funds used during construction that would have accrued from and after 24 the effective date of new base rates that reflect inclusion of the construction work in 25 progress in rate base. The commission shall determine, in a proceeding under section 26 393.170, the amount of construction work in progress that may be included in rate base. 27 The amount shall be limited by the estimated cost of such project and project 28 expenditures made within the estimated construction period for such project. Base rate 29 recoveries arising from inclusion of construction work in progress in base rates are 30 subject to refund, together with interest on the refunded amount at the same rate as the 31 rate of interest for delinquent taxes determined by the director of revenue in accordance 32 with section 32.065, if, and to the extent the commission determines, in a subsequent 33 complaint or general rate proceeding, that construction costs giving rise to the 34 construction work in progress included in rate base were imprudently incurred. Return 35 deferred under subdivision (2) of subsection 3 of section 393.1400 for plant that has been 36 included in base rates as construction work in progress shall offset the amounts deferred 37 under section 393.1400. 38 4. This section shall expire on December 31, 2036, unless the commission 39 determines, after a hearing conducted in 2036, upon a submission from an electrical 40 corporation of an application requesting and demonstrating that good cause exists to 41 extend the effectiveness of this section through December 31, 2046. The secretary of the 42 commission shall notify the revisor of statutes when the conditions set forth for the 43 extension of this subsection have been met. 44 5. The commission may promulgate rules to assist in the implementation of this 45 section. Any rule or portion of a rule, as that term is defined in section 536.010, that is 46 created under the authority delegated in this section shall become effective only if it 47 complies with and is subject to all of the provisions of chapter 536 and, if applicable, 48 section 536.028. This section and chapter 536 are nonseverable and if any of the powers 49 vested with the general assembly pursuant to chapter 536 to review, to delay the 50 effective date, or to disapprove and annul a rule are subsequently held unconstitutional, HB 1626 4

51 then the grant of rulemaking authority and any rule proposed or adopted after August 52 28, 2026, shall be invalid and void. ✔

Statutes affected:
Introduced (5171H.01): 393.135, 393.1250