HB 513 -- CERTAIN CONSTRUCTION CONTRACTS

SPONSOR: Voss

Currently, political subdivisions are authorized to use the construction manager-at-risk method for certain construction projects, as defined in statute. Statutory authority for that authorization is scheduled to expire on September 1, 2026.

This bill repeals the expiration of this section, allowing political subdivisions to continue to use the construction manager- at-risk method.

Currently, political subdivisions are authorized to use design- build contracts for certain construction projects, as defined in statute. Statutory authority for that authorization is scheduled to expire on September 1, 2026.

This bill repeals the expiration of this section, allowing political subdivisions to continue to use design-build contracts.

Statutes affected:
Introduced (1613H.01): 8.690, 67.5050, 67.5060
Committee (1613H.02): 8.690, 67.5050, 67.5060