Existing law defines the Construction Manager/General Contractor project delivery method (CM/GC method) as a project delivery method in which a construction manager is procured to provide preconstruction services during the design phase of a project and construction services during the construction phase of the project. Under existing law, the method allows the contract for construction services to be entered into at the same time as the contract for preconstruction services or at a later time. Existing law authorizes the Metropolitan Water District of Southern California to utilize the CM/GC method for regional recycled water projects or other water infrastructure projects under specified conditions. Pursuant to existing law, certain information required to be submitted as part of the CM/GC method is required to be verified under oath. Existing law makes the provisions described above pertaining to the CM/GC method effective only until January 1, 2028, and inoperative as of that date.
This bill would, until January 1, 2031, authorize a local agency, as defined, upon approval of its governing body, to similarly use the CM/GC method for a regional recycled water project or other water infrastructure project undertaken by the district to alleviate water supply shortages attributable to drought or climate change. Because the bill would expand the crime of perjury, it would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Statutes affected: SB 598: 56000 GOV
02/20/25 - Introduced: 56000 GOV
03/24/25 - Amended Senate: 56000 GOV